Does digital T&M ticketing save time?

Yes, mostly in the office. One SubTrack customer reports daily entries dropping from an hour to 10 minutes, and research from Dodge Construction Network and Clearstory puts the average wait from a signed T&M tag to a priced change order request at 22 days. A digital daily ticket saves time by removing the hand-offs paper needs: carrying it in, re-typing it, emailing it, and chasing the signature.

Last updated: November 18, 2026

The short answer

Digital T&M saves time when it removes steps between the work and the signed ticket. Industry surveys report hours a week lost to finding and fixing project information, and one SubTrack customer reports daily entries dropping from an hour to 10 minutes. Results depend on how many hand-offs your paper process has, so measure your own.

Where the time goes on paper

In a 2018 survey of 599 construction leaders commissioned by PlanGrid and run with FMI, respondents said each project team member spends more than 14 hours a week on non-optimal activities, including five and a half hours hunting down project data. The JBKnowledge 2020 ConTech Report found that manually integrating data between apps had been the most common practice for five years running. Both cover construction broadly, not T&M alone.

Slow approvals cost more than time

Research by Dodge Construction Network, published with Clearstory in 2026, reports that 65% of specialty contractors still use paper T&M tags, that it takes an average of 22 days to go from a signed tag in the field to a priced change order request at the GC, and that 77% of specialty contractors have had to write off change order work as bad debt. A 2022 Procore and Dodge survey of more than 500 specialty contractors reported that about 30 percent of project revenue is lost to change orders that go unbilled and unpaid. Both studies are vendor-associated and self-reported.

What a digital ticket removes

The foreman writes the ticket on a phone on site, so nothing is carried back or re-typed. Rates fill in from the project rate sheet, so nobody prices it later. The client signs from a secure link instead of a PDF loop. Revisions stay on the ticket, and the approved record goes straight to billing.

How to measure it on your own job

For one week of paper tickets, record the days from the work to a signed ticket and the office hours spent re-typing and chasing signatures. Run the next job digitally and record the same two numbers. That comparison is worth more than any industry average.

When it will not save time

If rates are not agreed before the work starts, or the client only accepts tickets in its own portal, a digital ticket still stalls. Agree the rate sheet up front and ask how the client wants to sign before you switch.

What contractors using SubTrack report

“It used to take me an hour to do daily entries. With SubTrack it takes me 10 minutes.”
Martin, TCL Contracting · Customer-reported
“We recovered a $14,000 invoice that was previously declined. SubTrack's documentation made the difference.”
Lynn Farrel, TCL Contracting · Customer-reported

Sources

  1. PlanGrid and FMI, Construction Disconnected (2018), press release (opens in a new tab)
  2. Construction Dive on the JBKnowledge 2020 ConTech Report (opens in a new tab)
  3. Dodge Construction Network and Clearstory, change order research for specialty contractors (2026) (opens in a new tab)
  4. Procore and Dodge Construction Network, specialty contractor survey (2022) (opens in a new tab)

FAQ

How much time does digital T&M save?

It depends on how many hand-offs your paper process has. One SubTrack customer reports daily entries dropping from an hour to 10 minutes. Industry surveys put time lost to finding project information at hours per person per week, but those figures cover all construction work, not T&M alone.

Does digital T&M help contractors get paid faster?

It shortens the path to a signed ticket. Dodge Construction Network research published with Clearstory reports an average of 22 days from a signed T&M tag to a priced change order request. Removing re-typing and PDF loops is how digital tickets cut into that time.

Are these industry numbers reliable?

Treat them as direction, not precision. They are self-reported surveys, several were run or funded by software vendors, and most cover construction broadly. Your own before-and-after numbers on one job are the most reliable evidence.

Start your first daily ticket today.

Run SubTrack on a live job before you pay for a seat. If it does not save your crew time, you walk away.

  • Free to try on any project
  • No credit card required
  • Setup help included

We're a young company and we build with our customers. Tell us what your crew needs: we read every suggestion and work with you on it. See what's coming on our roadmap.

Comparing costs? See pricing or Calculate ROI.

What happens next

  1. Create your account

    Sign up in a few minutes. No sales call needed.

  2. Add your crew and rates

    Enter them yourself, or send us your roster and rate sheets and we load them for you.

  3. Log the first daily ticket

    A supervisor can log the first ticket from the field the same day.