British Columbia · CAD
British Columbia dozer rates
Also called bulldozer, D6, D8. Rates by SubTrack.
British Columbia charge-out rates cover coastal civil, Interior logging roads, and Metro Vancouver utility work. Access, ferry, and mountain haul change the iron more than the trade. Numbers below are CAD T&M charge-out ranges, not take-home pay. Dozer charge-out in this book is D6 class and D8 class, typically bare hourly with fuel extra. Spreading, stripping, and pad work use the D6. Rock and long pushes move to the D8. These are T&M equipment rates, not ownership cost. In British Columbia, a dozer typically bills $200 /hr (range $175 to $230, as of 2026-08). For a check against nearby markets, Alberta sits at $200 /hr, and Washington sits at $190 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.
Prices in CAD. Fully loaded T&M charge-out, not wages.
British Columbia dozer
| Class | Unit | Low | Median | High |
|---|---|---|---|---|
Dozer - D6 Class Bare rate; add operator. | /hr | $175 | $200 | $230 |
Dozer - D8 Class Bare rate; add operator. | /hr | $245 | $280 | $315 |
Nearby dozer rates
British Columbia dozer FAQ
What is the dozer rate in British Columbia?
British Columbia dozer charge-out is about $200 /hr (low $175, high $230, as of 2026-08). Also searched as bulldozer, D6, D8. This is a fully loaded T&M range, not a wage.
Is this a rental or a T&M charge-out in British Columbia?
A T&M charge-out. Fuel, attachments, and mobilization are often extra. BC, B.C., Lower Mainland and Interior jobs still need the number that is on your sheet, not only this median.
Can I put this British Columbia dozer number on an invoice?
No. This is a public benchmark. SubTrack rate sheets lock your dozer class and premiums to the LEM so the field bills what the client signed.
How does British Columbia compare nearby?
Alberta median $200 /hr. Washington median $190 /hr
The index is a benchmark. Rate sheets are how you bill.
Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.
One template, every job
Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.
OT and markup apply themselves
Standby, overtime, and markup rules ride with the sheet. The field does not retype them.
The client sees what they signed
Line items match the agreed rates. Fewer disputes, faster approvals.
Project rate sheet
Labor · assigned to the job
| Position | Reg. rate | OT rate |
|---|---|---|
| Foreman | $72/hr | $108/hr |
| Operator | $68/hr | $102/hr |
| Laborer | $35/hr | $52.50/hr |