Your privacy choices

We use necessary storage for site preferences. Analytics and advertising tools stay off until you allow them.

Colorado · USD

Colorado welder rates

Also called B-pressure welder, welder with rig, combo welder. Rates by SubTrack.

Colorado charge-out rates follow Front Range civil, mountain utilities, and energy work. Altitude and winter access show up in iron first. These USD figures are fully loaded T&M ranges, not wages. Welder charge-out here is B-pressure and welder-with-rig. The rig truck is a different line from the ticket. These are fully loaded T&M hours, not a shop wage. In Colorado, a welder typically bills $120 /hr (range $105 to $140, as of 2026-08). For a check against nearby markets, Utah sits at $115 /hr, and Wyoming sits at $120 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.

Prices in USD. Fully loaded T&M charge-out, not wages.

Colorado welder

TradeUnitLowMedianHigh

Welder (B-Pressure)

Pressure welding; rate typically excludes rig.

/hr$105

$120

$140

Welder with Rig Truck

B-pressure welder including welding rig truck.

/hr$140

$160

$185

Colorado welder FAQ

What is the welder rate in Colorado?

Colorado welder charge-out is about $120 /hr (low $105, high $140, as of 2026-08). Also searched as B-pressure welder, welder with rig, combo welder. This is a fully loaded T&M range, not a wage.

Is this a rental or a T&M charge-out in Colorado?

A T&M charge-out. Fuel, attachments, and mobilization are often extra. CO, Denver and Front Range jobs still need the number that is on your sheet, not only this median.

Can I put this Colorado welder number on an invoice?

No. This is a public benchmark. SubTrack rate sheets lock your welder class and premiums to the LEM so the field bills what the client signed.

How does Colorado compare nearby?

Utah median $115 /hr. Wyoming median $120 /hr

Rate sheets

The index is a benchmark. Rate sheets are how you bill.

Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.

One template, every job

Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.

OT and markup apply themselves

Standby, overtime, and markup rules ride with the sheet. The field does not retype them.

The client sees what they signed

Line items match the agreed rates. Fewer disputes, faster approvals.

Project rate sheet

Labor · assigned to the job

PositionReg. rateOT rate
Foreman$72/hr$108/hr
Operator$68/hr$102/hr
Laborer$35/hr$52.50/hr