Your privacy choices

We use necessary storage for site preferences. Analytics and advertising tools stay off until you allow them.

Louisiana · USD

Louisiana backhoe rates

Also called loader backhoe, 580, tractor backhoe. Rates by SubTrack.

Louisiana charge-out rates sit on petrochem, turnaround, and Gulf Coast civil. Hydrovac, pipe, and weld run hotter than a Southeast residential index. These USD T&M ranges are public benchmarks, not a union package. Backhoe / loader-backhoe charge-out is the utility iron on service work, small trench, and site clean-up. It is not a 20-ton excavator. The book is an hourly T&M range, fuel usually extra. In Louisiana, a backhoe typically bills $90 /hr (range $75 to $100, as of 2026-08). For a check against nearby markets, Texas sits at $95 /hr, and Mississippi sits at $85 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.

Prices in USD. Fully loaded T&M charge-out, not wages.

Louisiana backhoe

ClassUnitLowMedianHigh

Backhoe - Loader/Backhoe

Bare rate; add operator.

/hr$75

$90

$100

Louisiana backhoe FAQ

What is the backhoe rate in Louisiana?

Louisiana backhoe charge-out is about $90 /hr (low $75, high $100, as of 2026-08). Also searched as loader backhoe, 580, tractor backhoe. This is a fully loaded T&M range, not a wage.

Is this a rental or a T&M charge-out in Louisiana?

A T&M charge-out. Fuel, attachments, and mobilization are often extra. LA, Baton Rouge, New Orleans, and the Gulf jobs still need the number that is on your sheet, not only this median.

Can I put this Louisiana backhoe number on an invoice?

No. This is a public benchmark. SubTrack rate sheets lock your backhoe class and premiums to the LEM so the field bills what the client signed.

How does Louisiana compare nearby?

Texas median $95 /hr. Mississippi median $85 /hr

Rate sheets

The index is a benchmark. Rate sheets are how you bill.

Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.

One template, every job

Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.

OT and markup apply themselves

Standby, overtime, and markup rules ride with the sheet. The field does not retype them.

The client sees what they signed

Line items match the agreed rates. Fewer disputes, faster approvals.

Project rate sheet

Labor · assigned to the job

PositionReg. rateOT rate
Foreman$72/hr$108/hr
Operator$68/hr$102/hr
Laborer$35/hr$52.50/hr