Your privacy choices

We use necessary storage for site preferences. Analytics and advertising tools stay off until you allow them.

Manitoba · CAD

Manitoba dozer rates

Also called bulldozer, D6, D8. Rates by SubTrack.

Manitoba rates follow Winnipeg commercial work and northern hydro and mining support. Winter freeze-up and long hauls into the north show up in equipment more than in a city laborer line. These are CAD charge-out ranges for T&M tickets. Dozer charge-out in this book is D6 class and D8 class, typically bare hourly with fuel extra. Spreading, stripping, and pad work use the D6. Rock and long pushes move to the D8. These are T&M equipment rates, not ownership cost. In Manitoba, a dozer typically bills $190 /hr (range $165 to $215, as of 2026-08). For a check against nearby markets, Saskatchewan sits at $190 /hr, and Ontario sits at $200 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.

Prices in CAD. Fully loaded T&M charge-out, not wages.

Manitoba dozer

ClassUnitLowMedianHigh

Dozer - D6 Class

Bare rate; add operator.

/hr$165

$190

$215

Dozer - D8 Class

Bare rate; add operator.

/hr$225

$260

$290

Manitoba dozer FAQ

What is the dozer rate in Manitoba?

Manitoba dozer charge-out is about $190 /hr (low $165, high $215, as of 2026-08). Also searched as bulldozer, D6, D8. This is a fully loaded T&M range, not a wage.

Is this a rental or a T&M charge-out in Manitoba?

A T&M charge-out. Fuel, attachments, and mobilization are often extra. MB, Winnipeg and northern Manitoba jobs still need the number that is on your sheet, not only this median.

Can I put this Manitoba dozer number on an invoice?

No. This is a public benchmark. SubTrack rate sheets lock your dozer class and premiums to the LEM so the field bills what the client signed.

How does Manitoba compare nearby?

Saskatchewan median $190 /hr. Ontario median $200 /hr

Rate sheets

The index is a benchmark. Rate sheets are how you bill.

Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.

One template, every job

Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.

OT and markup apply themselves

Standby, overtime, and markup rules ride with the sheet. The field does not retype them.

The client sees what they signed

Line items match the agreed rates. Fewer disputes, faster approvals.

Project rate sheet

Labor · assigned to the job

PositionReg. rateOT rate
Foreman$72/hr$108/hr
Operator$68/hr$102/hr
Laborer$35/hr$52.50/hr