Manitoba · CAD
Manitoba welder rates
Also called B-pressure welder, welder with rig, combo welder. Rates by SubTrack.
Manitoba rates follow Winnipeg commercial work and northern hydro and mining support. Winter freeze-up and long hauls into the north show up in equipment more than in a city laborer line. These are CAD charge-out ranges for T&M tickets. Welder charge-out here is B-pressure and welder-with-rig. The rig truck is a different line from the ticket. These are fully loaded T&M hours, not a shop wage. In Manitoba, a welder typically bills $130 /hr (range $110 to $150, as of 2026-08). For a check against nearby markets, Saskatchewan sits at $135 /hr, and Ontario sits at $150 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.
Prices in CAD. Fully loaded T&M charge-out, not wages.
Manitoba welder
| Trade | Unit | Low | Median | High |
|---|---|---|---|---|
Welder (B-Pressure) Pressure welding; rate typically excludes rig. | /hr | $110 | $130 | $150 |
Welder with Rig Truck B-pressure welder including welding rig truck. | /hr | $150 | $175 | $200 |
Nearby welder rates
Manitoba welder FAQ
What is the welder rate in Manitoba?
Manitoba welder charge-out is about $130 /hr (low $110, high $150, as of 2026-08). Also searched as B-pressure welder, welder with rig, combo welder. This is a fully loaded T&M range, not a wage.
Is this a rental or a T&M charge-out in Manitoba?
A T&M charge-out. Fuel, attachments, and mobilization are often extra. MB, Winnipeg and northern Manitoba jobs still need the number that is on your sheet, not only this median.
Can I put this Manitoba welder number on an invoice?
No. This is a public benchmark. SubTrack rate sheets lock your welder class and premiums to the LEM so the field bills what the client signed.
How does Manitoba compare nearby?
Saskatchewan median $135 /hr. Ontario median $150 /hr
The index is a benchmark. Rate sheets are how you bill.
Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.
One template, every job
Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.
OT and markup apply themselves
Standby, overtime, and markup rules ride with the sheet. The field does not retype them.
The client sees what they signed
Line items match the agreed rates. Fewer disputes, faster approvals.
Project rate sheet
Labor · assigned to the job
| Position | Reg. rate | OT rate |
|---|---|---|
| Foreman | $72/hr | $108/hr |
| Operator | $68/hr | $102/hr |
| Laborer | $35/hr | $52.50/hr |