Your privacy choices

We use necessary storage for site preferences. Analytics and advertising tools stay off until you allow them.

Minnesota · USD

Minnesota hydrovac rates

Also called hydro vac, vac truck, daylighting truck. Rates by SubTrack.

Minnesota charge-out rates sit on Twin Cities civil and utilities, plus Iron Range and northern energy support. Winter production is not a July number. These USD figures are public T&M benchmarks. Hydrovac charge-out is a two-person crew and the truck, billed by the hour. Daylighting, potholing, and winter thaw work all use this line. 2026 standard combo-truck quotes sit roughly $275–$400/hr in the US; this book is a blended T&M range, not an emergency call-out. Disposal and water are often extra. In Minnesota, a hydrovac typically bills $330 /hr (range $290 to $370, as of 2026-08). For a check against nearby markets, Wisconsin sits at $320 /hr, and North Dakota sits at $365 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.

Prices in USD. Fully loaded T&M charge-out, not wages.

Minnesota hydrovac

ClassUnitLowMedianHigh

Hydrovac Truck (2-person crew)

Operated rate - includes crew.

/hr$290

$330

$370

Minnesota hydrovac FAQ

What is the hydrovac rate in Minnesota?

Minnesota hydrovac charge-out is about $330 /hr (low $290, high $370, as of 2026-08). Also searched as hydro vac, vac truck, daylighting truck. This is a fully loaded T&M range, not a wage.

Is this a rental or a T&M charge-out in Minnesota?

A T&M charge-out. Fuel, attachments, and mobilization are often extra. MN, Twin Cities and Iron Range jobs still need the number that is on your sheet, not only this median.

Can I put this Minnesota hydrovac number on an invoice?

No. This is a public benchmark. SubTrack rate sheets lock your hydrovac class and premiums to the LEM so the field bills what the client signed.

How does Minnesota compare nearby?

Wisconsin median $320 /hr. North Dakota median $365 /hr

Rate sheets

The index is a benchmark. Rate sheets are how you bill.

Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.

One template, every job

Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.

OT and markup apply themselves

Standby, overtime, and markup rules ride with the sheet. The field does not retype them.

The client sees what they signed

Line items match the agreed rates. Fewer disputes, faster approvals.

Project rate sheet

Labor · assigned to the job

PositionReg. rateOT rate
Foreman$72/hr$108/hr
Operator$68/hr$102/hr
Laborer$35/hr$52.50/hr