Your privacy choices

We use necessary storage for site preferences. Analytics and advertising tools stay off until you allow them.

New Jersey · USD

New Jersey general laborer rates

Also called laborer, construction laborer, labourer. Rates by SubTrack.

New Jersey charge-out rates sit on North Jersey civil, port, and pharma industrial. Access and prevailing wage can sit above a public median. These USD T&M ranges are a check, not the invoice. General laborer charge-out is the most-used T&M labor line on civil tickets. It is not a pipelayer or a skilled laborer. OT rules belong on your sheet so the field does not invent them. In New Jersey, a general laborer typically bills $75 /hr (range $60 to $85, as of 2026-08). For a check against nearby markets, New York sits at $80 /hr, and Pennsylvania sits at $60 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.

Prices in USD. Fully loaded T&M charge-out, not wages.

New Jersey general laborer

TradeUnitLowMedianHigh

General Laborer

Site labor, flagging, general cleanup and support work.

/hr$60

$75

$85

New Jersey general laborer FAQ

What is the general laborer rate in New Jersey?

New Jersey general laborer charge-out is about $75 /hr (low $60, high $85, as of 2026-08). Also searched as laborer, construction laborer, labourer. This is a fully loaded T&M range, not a wage.

Is this a rental or a T&M charge-out in New Jersey?

A T&M charge-out. Fuel, attachments, and mobilization are often extra. NJ, North Jersey and the Shore jobs still need the number that is on your sheet, not only this median.

Can I put this New Jersey general laborer number on an invoice?

No. This is a public benchmark. SubTrack rate sheets lock your general laborer class and premiums to the LEM so the field bills what the client signed.

How does New Jersey compare nearby?

New York median $80 /hr. Pennsylvania median $60 /hr

Rate sheets

The index is a benchmark. Rate sheets are how you bill.

Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.

One template, every job

Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.

OT and markup apply themselves

Standby, overtime, and markup rules ride with the sheet. The field does not retype them.

The client sees what they signed

Line items match the agreed rates. Fewer disputes, faster approvals.

Project rate sheet

Labor · assigned to the job

PositionReg. rateOT rate
Foreman$72/hr$108/hr
Operator$68/hr$102/hr
Laborer$35/hr$52.50/hr