Your privacy choices

We use necessary storage for site preferences. Analytics and advertising tools stay off until you allow them.

New York · USD

New York backhoe rates

Also called loader backhoe, 580, tractor backhoe. Rates by SubTrack.

New York rates are among the highest in the book, especially on NYC civil. Prevailing wage and access can sit above a public median. Use these USD T&M ranges as a check, then lock the number the client signed. Backhoe / loader-backhoe charge-out is the utility iron on service work, small trench, and site clean-up. It is not a 20-ton excavator. The book is an hourly T&M range, fuel usually extra. In New York, a backhoe typically bills $110 /hr (range $90 to $125, as of 2026-08). For a check against nearby markets, New Jersey sits at $105 /hr, and Pennsylvania sits at $95 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.

Prices in USD. Fully loaded T&M charge-out, not wages.

New York backhoe

ClassUnitLowMedianHigh

Backhoe - Loader/Backhoe

Bare rate; add operator.

/hr$90

$110

$125

New York backhoe FAQ

What is the backhoe rate in New York?

New York backhoe charge-out is about $110 /hr (low $90, high $125, as of 2026-08). Also searched as loader backhoe, 580, tractor backhoe. This is a fully loaded T&M range, not a wage.

Is this a rental or a T&M charge-out in New York?

A T&M charge-out. Fuel, attachments, and mobilization are often extra. NY, NYC and Upstate jobs still need the number that is on your sheet, not only this median.

Can I put this New York backhoe number on an invoice?

No. This is a public benchmark. SubTrack rate sheets lock your backhoe class and premiums to the LEM so the field bills what the client signed.

How does New York compare nearby?

New Jersey median $105 /hr. Pennsylvania median $95 /hr

Rate sheets

The index is a benchmark. Rate sheets are how you bill.

Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.

One template, every job

Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.

OT and markup apply themselves

Standby, overtime, and markup rules ride with the sheet. The field does not retype them.

The client sees what they signed

Line items match the agreed rates. Fewer disputes, faster approvals.

Project rate sheet

Labor · assigned to the job

PositionReg. rateOT rate
Foreman$72/hr$108/hr
Operator$68/hr$102/hr
Laborer$35/hr$52.50/hr