New York · USD
New York dozer rates
Also called bulldozer, D6, D8. Rates by SubTrack.
New York rates are among the highest in the book, especially on NYC civil. Prevailing wage and access can sit above a public median. Use these USD T&M ranges as a check, then lock the number the client signed. Dozer charge-out in this book is D6 class and D8 class, typically bare hourly with fuel extra. Spreading, stripping, and pad work use the D6. Rock and long pushes move to the D8. These are T&M equipment rates, not ownership cost. In New York, a dozer typically bills $200 /hr (range $175 to $230, as of 2026-08). For a check against nearby markets, New Jersey sits at $195 /hr, and Pennsylvania sits at $180 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.
Prices in USD. Fully loaded T&M charge-out, not wages.
New York dozer
| Class | Unit | Low | Median | High |
|---|---|---|---|---|
Dozer - D6 Class Bare rate; add operator. | /hr | $175 | $200 | $230 |
Dozer - D8 Class Bare rate; add operator. | /hr | $240 | $280 | $315 |
Nearby dozer rates
New York dozer FAQ
What is the dozer rate in New York?
New York dozer charge-out is about $200 /hr (low $175, high $230, as of 2026-08). Also searched as bulldozer, D6, D8. This is a fully loaded T&M range, not a wage.
Is this a rental or a T&M charge-out in New York?
A T&M charge-out. Fuel, attachments, and mobilization are often extra. NY, NYC and Upstate jobs still need the number that is on your sheet, not only this median.
Can I put this New York dozer number on an invoice?
No. This is a public benchmark. SubTrack rate sheets lock your dozer class and premiums to the LEM so the field bills what the client signed.
How does New York compare nearby?
New Jersey median $195 /hr. Pennsylvania median $180 /hr
The index is a benchmark. Rate sheets are how you bill.
Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.
One template, every job
Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.
OT and markup apply themselves
Standby, overtime, and markup rules ride with the sheet. The field does not retype them.
The client sees what they signed
Line items match the agreed rates. Fewer disputes, faster approvals.
Project rate sheet
Labor · assigned to the job
| Position | Reg. rate | OT rate |
|---|---|---|
| Foreman | $72/hr | $108/hr |
| Operator | $68/hr | $102/hr |
| Laborer | $35/hr | $52.50/hr |