North Carolina · USD
North Carolina dozer rates
Also called bulldozer, D6, D8. Rates by SubTrack.
North Carolina charge-out rates follow Charlotte and Research Triangle civil, plus coastal and mountain utility work. These USD figures are fully loaded T&M ranges for labor and iron, not wages. Dozer charge-out in this book is D6 class and D8 class, typically bare hourly with fuel extra. Spreading, stripping, and pad work use the D6. Rock and long pushes move to the D8. These are T&M equipment rates, not ownership cost. In North Carolina, a dozer typically bills $170 /hr (range $145 to $190, as of 2026-08). For a check against nearby markets, South Carolina sits at $165 /hr, and Virginia sits at $175 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.
Prices in USD. Fully loaded T&M charge-out, not wages.
North Carolina dozer
| Class | Unit | Low | Median | High |
|---|---|---|---|---|
Dozer - D6 Class Bare rate; add operator. | /hr | $145 | $170 | $190 |
Dozer - D8 Class Bare rate; add operator. | /hr | $200 | $230 | $260 |
Nearby dozer rates
North Carolina dozer FAQ
What is the dozer rate in North Carolina?
North Carolina dozer charge-out is about $170 /hr (low $145, high $190, as of 2026-08). Also searched as bulldozer, D6, D8. This is a fully loaded T&M range, not a wage.
Is this a rental or a T&M charge-out in North Carolina?
A T&M charge-out. Fuel, attachments, and mobilization are often extra. NC, Charlotte and Raleigh jobs still need the number that is on your sheet, not only this median.
Can I put this North Carolina dozer number on an invoice?
No. This is a public benchmark. SubTrack rate sheets lock your dozer class and premiums to the LEM so the field bills what the client signed.
How does North Carolina compare nearby?
South Carolina median $165 /hr. Virginia median $175 /hr
The index is a benchmark. Rate sheets are how you bill.
Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.
One template, every job
Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.
OT and markup apply themselves
Standby, overtime, and markup rules ride with the sheet. The field does not retype them.
The client sees what they signed
Line items match the agreed rates. Fewer disputes, faster approvals.
Project rate sheet
Labor · assigned to the job
| Position | Reg. rate | OT rate |
|---|---|---|
| Foreman | $72/hr | $108/hr |
| Operator | $68/hr | $102/hr |
| Laborer | $35/hr | $52.50/hr |