North Carolina · USD
North Carolina welder rates
Also called B-pressure welder, welder with rig, combo welder. Rates by SubTrack.
North Carolina charge-out rates follow Charlotte and Research Triangle civil, plus coastal and mountain utility work. These USD figures are fully loaded T&M ranges for labor and iron, not wages. Welder charge-out here is B-pressure and welder-with-rig. The rig truck is a different line from the ticket. These are fully loaded T&M hours, not a shop wage. In North Carolina, a welder typically bills $105 /hr (range $90 to $120, as of 2026-08). For a check against nearby markets, South Carolina sits at $100 /hr, and Virginia sits at $115 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.
Prices in USD. Fully loaded T&M charge-out, not wages.
North Carolina welder
| Trade | Unit | Low | Median | High |
|---|---|---|---|---|
Welder (B-Pressure) Pressure welding; rate typically excludes rig. | /hr | $90 | $105 | $120 |
Welder with Rig Truck B-pressure welder including welding rig truck. | /hr | $120 | $140 | $155 |
Nearby welder rates
North Carolina welder FAQ
What is the welder rate in North Carolina?
North Carolina welder charge-out is about $105 /hr (low $90, high $120, as of 2026-08). Also searched as B-pressure welder, welder with rig, combo welder. This is a fully loaded T&M range, not a wage.
Is this a rental or a T&M charge-out in North Carolina?
A T&M charge-out. Fuel, attachments, and mobilization are often extra. NC, Charlotte and Raleigh jobs still need the number that is on your sheet, not only this median.
Can I put this North Carolina welder number on an invoice?
No. This is a public benchmark. SubTrack rate sheets lock your welder class and premiums to the LEM so the field bills what the client signed.
How does North Carolina compare nearby?
South Carolina median $100 /hr. Virginia median $115 /hr
The index is a benchmark. Rate sheets are how you bill.
Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.
One template, every job
Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.
OT and markup apply themselves
Standby, overtime, and markup rules ride with the sheet. The field does not retype them.
The client sees what they signed
Line items match the agreed rates. Fewer disputes, faster approvals.
Project rate sheet
Labor · assigned to the job
| Position | Reg. rate | OT rate |
|---|---|---|
| Foreman | $72/hr | $108/hr |
| Operator | $68/hr | $102/hr |
| Laborer | $35/hr | $52.50/hr |