Ohio · USD
Ohio backhoe rates
Also called loader backhoe, 580, tractor backhoe. Rates by SubTrack.
Ohio rates cover Midwest civil, auto, and chemical plant work. The book sits between the Southeast and the Northeast. These USD charge-out ranges are public T&M benchmarks, not take-home pay. Backhoe / loader-backhoe charge-out is the utility iron on service work, small trench, and site clean-up. It is not a 20-ton excavator. The book is an hourly T&M range, fuel usually extra. In Ohio, a backhoe typically bills $95 /hr (range $80 to $110, as of 2026-08). For a check against nearby markets, Pennsylvania sits at $95 /hr, and Indiana sits at $90 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.
Prices in USD. Fully loaded T&M charge-out, not wages.
Ohio backhoe
| Class | Unit | Low | Median | High |
|---|---|---|---|---|
Backhoe - Loader/Backhoe Bare rate; add operator. | /hr | $80 | $95 | $110 |
Nearby backhoe rates
Ohio backhoe FAQ
What is the backhoe rate in Ohio?
Ohio backhoe charge-out is about $95 /hr (low $80, high $110, as of 2026-08). Also searched as loader backhoe, 580, tractor backhoe. This is a fully loaded T&M range, not a wage.
Is this a rental or a T&M charge-out in Ohio?
A T&M charge-out. Fuel, attachments, and mobilization are often extra. OH, Columbus, Cleveland, and Cincinnati jobs still need the number that is on your sheet, not only this median.
Can I put this Ohio backhoe number on an invoice?
No. This is a public benchmark. SubTrack rate sheets lock your backhoe class and premiums to the LEM so the field bills what the client signed.
How does Ohio compare nearby?
Pennsylvania median $95 /hr. Indiana median $90 /hr
The index is a benchmark. Rate sheets are how you bill.
Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.
One template, every job
Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.
OT and markup apply themselves
Standby, overtime, and markup rules ride with the sheet. The field does not retype them.
The client sees what they signed
Line items match the agreed rates. Fewer disputes, faster approvals.
Project rate sheet
Labor · assigned to the job
| Position | Reg. rate | OT rate |
|---|---|---|
| Foreman | $72/hr | $108/hr |
| Operator | $68/hr | $102/hr |
| Laborer | $35/hr | $52.50/hr |