Oklahoma · USD

Oklahoma dozer rates

Dozer charge-out in this book is D6 class and D8 class, typically bare hourly with fuel extra. Spreading, stripping, and pad work use the D6. Rock and long pushes move to the D8. These are T&M equipment rates, not ownership cost. In Oklahoma, the dozer central reference is $165 USD/hr (range $140 USD to $190 USD, as of 2026-08). That figure is a modeled benchmark for bare equipment. The published primary class is D6 Class. Nearby-book checks: Texas central reference $175 USD/hr, and Kansas central reference $165 USD/hr. These are public reference figures, not a quote. Bill the rate on the signed project sheet.

Prices in USD. Public T&M reference ranges, not wages or a quote.

Oklahoma dozer, D6 Class

Central reference $165 USD/hr (USD), range $140 USD to $190 USD. Effective month 2026-08.

Bare equipment in USD/hr. Geographic scope: Oklahoma. Equipment class: D6 Class.

Operator excluded. Fuel not stated.

Book effective month 2026-08. Stored source "reference". No separate review date is on file.

Modeled benchmark. This state was scaled from the Texas baseline. The factor uses the BuildCost 2026 residential cost index divided by 105. That index is a housing-cost index, not a measured equipment or labor price. BuildCost 2026 Construction Cost Index.

This page lists 2 classes. The figure above is only Dozer - D6 Class, not a single price for every dozer.

Illustration, not a quote: 8 hours at the central reference is 8 × $165 USD = $1,320 USD. Bill the signed project rate instead.

ClassLowCentralHigh

Dozer - D6 Class

Bare rate; add operator. · D6 Class

Bare equipment · USD/hr · Modeled benchmark · effective 2026-08

Operator excluded. Fuel not stated.

$140 USD

$165 USD

$190 USD

Dozer - D8 Class

Bare rate; add operator. · D8 Class

Bare equipment · USD/hr · Modeled benchmark · effective 2026-08

Operator excluded. Fuel not stated.

$200 USD

$225 USD

$255 USD

Use your agreed rates on every daily ticket.

These public ranges are a benchmark. SubTrack stores the rates you agreed with the client on a project rate sheet. Crews apply those rates to labor, equipment, materials, and subcontractors on the daily ticket. The same figures carry into reporting and the billing documents you send.

Oklahoma dozer FAQ

What is the dozer rate in Oklahoma?

Oklahoma dozer central reference is $165 USD/hr (low $140 USD, high $190 USD, effective 2026-08). It is a modeled benchmark for bare equipment, class D6 Class. It is not a wage.

Does this Oklahoma dozer line include an operator and fuel?

Bare equipment. Operator excluded. Fuel not stated. Attachments and mobilization are not assumed.

Can I put this Oklahoma dozer number on an invoice?

No. This is a public reference figure. SubTrack rate sheets lock your dozer class and premiums to the daily ticket so the field bills what the client signed.

How does Oklahoma compare nearby?

Texas central reference $175 USD/hr. Kansas central reference $165 USD/hr