Your privacy choices

We use necessary storage for site preferences. Analytics and advertising tools stay off until you allow them.

Oklahoma · USD

Oklahoma general laborer rates

Also called laborer, construction laborer, labourer. Rates by SubTrack.

Oklahoma charge-out rates follow OKC civil, Tulsa industrial, and mid-continent energy. Pipe and hydrovac track Texas more than a Southeast dirt number. These USD figures are fully loaded T&M ranges. General laborer charge-out is the most-used T&M labor line on civil tickets. It is not a pipelayer or a skilled laborer. OT rules belong on your sheet so the field does not invent them. In Oklahoma, a general laborer typically bills $55 /hr (range $45 to $60, as of 2026-08). For a check against nearby markets, Texas sits at $60 /hr, and Kansas sits at $55 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.

Prices in USD. Fully loaded T&M charge-out, not wages.

Oklahoma general laborer

TradeUnitLowMedianHigh

General Laborer

Site labor, flagging, general cleanup and support work.

/hr$45

$55

$60

Oklahoma general laborer FAQ

What is the general laborer rate in Oklahoma?

Oklahoma general laborer charge-out is about $55 /hr (low $45, high $60, as of 2026-08). Also searched as laborer, construction laborer, labourer. This is a fully loaded T&M range, not a wage.

Is this a rental or a T&M charge-out in Oklahoma?

A T&M charge-out. Fuel, attachments, and mobilization are often extra. OK, Oklahoma City and Tulsa jobs still need the number that is on your sheet, not only this median.

Can I put this Oklahoma general laborer number on an invoice?

No. This is a public benchmark. SubTrack rate sheets lock your general laborer class and premiums to the LEM so the field bills what the client signed.

How does Oklahoma compare nearby?

Texas median $60 /hr. Kansas median $55 /hr

Rate sheets

The index is a benchmark. Rate sheets are how you bill.

Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.

One template, every job

Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.

OT and markup apply themselves

Standby, overtime, and markup rules ride with the sheet. The field does not retype them.

The client sees what they signed

Line items match the agreed rates. Fewer disputes, faster approvals.

Project rate sheet

Labor · assigned to the job

PositionReg. rateOT rate
Foreman$72/hr$108/hr
Operator$68/hr$102/hr
Laborer$35/hr$52.50/hr