Ontario · CAD
Ontario motor grader rates
Also called 140 grader, 14 grader, blade. Rates by SubTrack.
Ontario rates span GTA high-rise and utilities, Ottawa civil, and Northern mining support. Union density in the GTA is not the same as a Thunder Bay T&M job. The book shows CAD fully loaded charge-out ranges you still have to confirm on the sheet. Motor grader charge-out in this book is 140/14 class, typically bare hourly. Fine grade, road maintenance, and pad shaping use this line. Fuel and the operator are usually extra. In Ontario, a motor grader typically bills $195 /hr (range $170 to $220, as of 2026-08). For a check against nearby markets, Quebec sits at $190 /hr, and Manitoba sits at $180 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.
Prices in CAD. Fully loaded T&M charge-out, not wages.
Ontario motor grader
| Class | Unit | Low | Median | High |
|---|---|---|---|---|
Motor Grader - 140/14 Class Bare rate; add operator. | /hr | $170 | $195 | $220 |
Nearby motor grader rates
Ontario motor grader FAQ
What is the motor grader rate in Ontario?
Ontario motor grader charge-out is about $195 /hr (low $170, high $220, as of 2026-08). Also searched as 140 grader, 14 grader, blade. This is a fully loaded T&M range, not a wage.
Is this a rental or a T&M charge-out in Ontario?
A T&M charge-out. Fuel, attachments, and mobilization are often extra. ON, GTA, Ottawa, and Northern Ontario jobs still need the number that is on your sheet, not only this median.
Can I put this Ontario motor grader number on an invoice?
No. This is a public benchmark. SubTrack rate sheets lock your motor grader class and premiums to the LEM so the field bills what the client signed.
How does Ontario compare nearby?
Quebec median $190 /hr. Manitoba median $180 /hr
The index is a benchmark. Rate sheets are how you bill.
Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.
One template, every job
Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.
OT and markup apply themselves
Standby, overtime, and markup rules ride with the sheet. The field does not retype them.
The client sees what they signed
Line items match the agreed rates. Fewer disputes, faster approvals.
Project rate sheet
Labor · assigned to the job
| Position | Reg. rate | OT rate |
|---|---|---|
| Foreman | $72/hr | $108/hr |
| Operator | $68/hr | $102/hr |
| Laborer | $35/hr | $52.50/hr |