Your privacy choices

We use necessary storage for site preferences. Analytics and advertising tools stay off until you allow them.

Oregon · USD

Oregon hydrovac rates

Also called hydro vac, vac truck, daylighting truck. Rates by SubTrack.

Oregon rates sit on Portland civil, ports, and I-5 industrial. Prevailing wage in the metro is not the same as an Eastern Oregon T&M job. These USD charge-out ranges are public benchmarks, not employee pay. Hydrovac charge-out is a two-person crew and the truck, billed by the hour. Daylighting, potholing, and winter thaw work all use this line. 2026 standard combo-truck quotes sit roughly $275–$400/hr in the US; this book is a blended T&M range, not an emergency call-out. Disposal and water are often extra. In Oregon, a hydrovac typically bills $350 /hr (range $305 to $390, as of 2026-08). For a check against nearby markets, Washington sits at $365 /hr, and California sits at $375 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.

Prices in USD. Fully loaded T&M charge-out, not wages.

Oregon hydrovac

ClassUnitLowMedianHigh

Hydrovac Truck (2-person crew)

Operated rate - includes crew.

/hr$305

$350

$390

Oregon hydrovac FAQ

What is the hydrovac rate in Oregon?

Oregon hydrovac charge-out is about $350 /hr (low $305, high $390, as of 2026-08). Also searched as hydro vac, vac truck, daylighting truck. This is a fully loaded T&M range, not a wage.

Is this a rental or a T&M charge-out in Oregon?

A T&M charge-out. Fuel, attachments, and mobilization are often extra. OR, Portland and the I-5 corridor jobs still need the number that is on your sheet, not only this median.

Can I put this Oregon hydrovac number on an invoice?

No. This is a public benchmark. SubTrack rate sheets lock your hydrovac class and premiums to the LEM so the field bills what the client signed.

How does Oregon compare nearby?

Washington median $365 /hr. California median $375 /hr

Rate sheets

The index is a benchmark. Rate sheets are how you bill.

Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.

One template, every job

Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.

OT and markup apply themselves

Standby, overtime, and markup rules ride with the sheet. The field does not retype them.

The client sees what they signed

Line items match the agreed rates. Fewer disputes, faster approvals.

Project rate sheet

Labor · assigned to the job

PositionReg. rateOT rate
Foreman$72/hr$108/hr
Operator$68/hr$102/hr
Laborer$35/hr$52.50/hr