Your privacy choices

We use necessary storage for site preferences. Analytics and advertising tools stay off until you allow them.

Quebec · CAD

Quebec heavy equipment operator rates

Also called HEO, operator, equipment operator. Rates by SubTrack.

Quebec charge-out rates sit on civil, hydro, and industrial work around Montreal and Quebec City. Decree and union rules can sit above a public benchmark. These CAD figures are a T&M starting point, not a substitute for the rate the job signed. Heavy equipment operator charge-out is the labor line that rides with the iron. It is not the machine rate. OT and shift premiums belong on the rate sheet, not in a public median. In Quebec, a heavy equipment operator typically bills $110 /hr (range $95 to $120, as of 2026-08). For a check against nearby markets, Ontario sits at $115 /hr, and New Brunswick sits at $100 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.

Prices in CAD. Fully loaded T&M charge-out, not wages.

Quebec heavy equipment operator

TradeUnitLowMedianHigh

Heavy Equipment Operator

Operator billed separately from bare equipment rate.

/hr$95

$110

$120

Quebec heavy equipment operator FAQ

What is the heavy equipment operator rate in Quebec?

Quebec heavy equipment operator charge-out is about $110 /hr (low $95, high $120, as of 2026-08). Also searched as HEO, operator, equipment operator. This is a fully loaded T&M range, not a wage.

Is this a rental or a T&M charge-out in Quebec?

A T&M charge-out. Fuel, attachments, and mobilization are often extra. QC, Montreal and Quebec City jobs still need the number that is on your sheet, not only this median.

Can I put this Quebec heavy equipment operator number on an invoice?

No. This is a public benchmark. SubTrack rate sheets lock your heavy equipment operator class and premiums to the LEM so the field bills what the client signed.

How does Quebec compare nearby?

Ontario median $115 /hr. New Brunswick median $100 /hr

Rate sheets

The index is a benchmark. Rate sheets are how you bill.

Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.

One template, every job

Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.

OT and markup apply themselves

Standby, overtime, and markup rules ride with the sheet. The field does not retype them.

The client sees what they signed

Line items match the agreed rates. Fewer disputes, faster approvals.

Project rate sheet

Labor · assigned to the job

PositionReg. rateOT rate
Foreman$72/hr$108/hr
Operator$68/hr$102/hr
Laborer$35/hr$52.50/hr