Alaska · USD
Alaska general laborer rates
Also called laborer, construction laborer, labourer. Rates by SubTrack.
Alaska charge-out rates carry camp, barge, and short-season premiums that a Lower 48 sheet will miss. North Slope and remote civil are not Anchorage commercial. These USD T&M ranges are a floor; add mobilization and isolation before you bill. General laborer charge-out is the most-used T&M labor line on civil tickets. It is not a pipelayer or a skilled laborer. OT rules belong on your sheet so the field does not invent them. In Alaska, a general laborer typically bills $85 /hr (range $70 to $95, as of 2026-08). For a check against nearby markets, Washington sits at $70 /hr, and Northern Canada (YT/NT/NU) sits at $90 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.
Prices in USD. Fully loaded T&M charge-out, not wages.
Alaska general laborer
| Trade | Unit | Low | Median | High |
|---|---|---|---|---|
General Laborer Site labor, flagging, general cleanup and support work. | /hr | $70 | $85 | $95 |
Nearby general laborer rates
Alaska general laborer FAQ
What is the general laborer rate in Alaska?
Alaska general laborer charge-out is about $85 /hr (low $70, high $95, as of 2026-08). Also searched as laborer, construction laborer, labourer. This is a fully loaded T&M range, not a wage.
Is this a rental or a T&M charge-out in Alaska?
A T&M charge-out. Fuel, attachments, and mobilization are often extra. AK, Anchorage, Fairbanks, and the Slope jobs still need the number that is on your sheet, not only this median.
Can I put this Alaska general laborer number on an invoice?
No. This is a public benchmark. SubTrack rate sheets lock your general laborer class and premiums to the LEM so the field bills what the client signed.
How does Alaska compare nearby?
Washington median $70 /hr. Northern Canada (YT/NT/NU) median $90 /hr
The index is a benchmark. Rate sheets are how you bill.
Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.
One template, every job
Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.
OT and markup apply themselves
Standby, overtime, and markup rules ride with the sheet. The field does not retype them.
The client sees what they signed
Line items match the agreed rates. Fewer disputes, faster approvals.
Project rate sheet
Labor · assigned to the job
| Position | Reg. rate | OT rate |
|---|---|---|
| Foreman | $72/hr | $108/hr |
| Operator | $68/hr | $102/hr |
| Laborer | $35/hr | $52.50/hr |