Alaska charge-out rates

Also called AK, Anchorage, Fairbanks, and the Slope. Rates by SubTrack.

Alaska charge-out rates carry camp, barge, and short-season premiums that a Lower 48 sheet will miss. North Slope and remote civil are not Anchorage commercial. These USD T&M ranges are a floor; add mobilization and isolation before you bill.

Prices in USD. Fully loaded T&M charge-out, not wages.

Alaska labor

TradeUnitLowMedianHigh
Boilermaker

Pressure vessel and boiler work.

/hr$130

$155

$175
Carpenter (Journeyman)

Formwork, framing, finishing.

/hr$95

$110

$125
Concrete Finisher

Placing and finishing structural and flatwork concrete.

/hr$95

$110

$125
Crane Operator (Journeyman)

Mobile and tower crane operation.

/hr$125

$145

$165
Electrician (Journeyman)

Industrial and commercial electrical installation.

/hr$115

$140

$150
General Laborer

Site labor, flagging, general cleanup and support work.

/hr$70

$85

$95
Heavy Equipment Operator

Operator billed separately from bare equipment rate.

/hr$105

$125

$140
HVAC / Refrigeration Mechanic

HVAC installation and service.

/hr$115

$140

$150
Instrumentation Technician

Instrumentation and controls, industrial plants.

/hr$140

$160

$175
Insulator (Mechanical)

Mechanical insulation, industrial settings.

/hr$105

$125

$140
Ironworker

Structural steel erection, rebar placing.

/hr$110

$125

$145
Millwright

Mechanical equipment installation and alignment.

/hr$130

$145

$170
Painter / Coatings (Industrial)

Industrial coatings and blasting.

/hr$95

$110

$130
Pipefitter / Steamfitter

Process and utility piping, industrial settings.

/hr$130

$145

$170
Plumber (Journeyman)

Commercial and industrial plumbing.

/hr$110

$125

$145
Project Manager

Typically billed on T&M for owner-directed extras.

/hr$160

$180

$205
Safety Officer (NCSO/CHST)

Dedicated site safety supervision.

/hr$105

$125

$140
Scaffolder

Scaffold erection and dismantle.

/hr$95

$110

$130
Skilled Laborer / Pipelayer

Grade checking, pipe laying, trench work.

/hr$85

$95

$105
Superintendent

Site supervision above foreman level.

/hr$150

$175

$195
Survey Crew (2-person, equipped)

Two-person survey crew including instruments.

/hr$180

$205

$240
Truck Driver (Class 1 / CDL-A)

Driver billed separately from bare truck rate.

/hr$85

$95

$110
Welder (B-Pressure)

Pressure welding; rate typically excludes rig.

/hr$145

$170

$190
Welder with Rig Truck

B-pressure welder including welding rig truck.

/hr$190

$220

$250
Working Foreman

Trade foreman, typically working with tools.

/hr$125

$140

$160

Alaska equipment

EquipmentUnitLowMedianHigh
Air Compressor - 185 CFM

Daily bare rental, fuel extra.

/day$110

$140

$165
Articulated Rock Truck - 40 Ton

Bare rate; add operator.

/hr$190

$225

$255
Backhoe - Loader/Backhoe

Bare rate; add operator.

/hr$100

$120

$140
Boom Lift - 60 ft

Bare rate.

/hr$85

$100

$120
Dozer - D6 Class

Bare rate; add operator.

/hr$190

$225

$255
Dozer - D8 Class

Bare rate; add operator.

/hr$270

$305

$345
Excavator - 20 Ton Class (e.g. 320/200)

Bare rate; add operator. Tracked hydraulic excavator.

/hr$180

$205

$235
Excavator - 30 Ton Class (e.g. 330/300)

Bare rate; add operator.

/hr$225

$255

$285
Excavator - 45 Ton Class

Bare rate; add operator. Mass excavation class.

/hr$280

$330

$375
Generator - 100 kW

Daily bare rental, fuel extra.

/day$275

$330

$390
Hydrovac Truck (2-person crew)

Operated rate - includes crew.

/hr$390

$445

$500
Light Tower

Daily bare rental, fuel extra.

/day$135

$170

$210
Mini Excavator - 3-5 Ton

Bare rate; add operator.

/hr$85

$100

$120
Mobile Crane - 100 Ton (operated)

Operated and maintained rate.

/hr$375

$435

$490
Mobile Crane - 60 Ton (operated)

Operated and maintained rate.

/hr$285

$330

$380
Motor Grader - 140/14 Class

Bare rate; add operator.

/hr$185

$215

$240
Motor Scraper - 621/623 Class

Bare rate; add operator.

/hr$260

$300

$340
Packer - Padfoot/Smooth 84"

Bare rate; add operator.

/hr$125

$155

$170
Picker / Boom Truck - 45 Ton (operated)

Operated rate.

/hr$240

$280

$325
Scissor Lift - 26 ft

Daily bare rental.

/day$210

$255

$300
Site Office Trailer

Daily rate, delivery extra.

/day$50

$70

$90
Skid Steer

Bare rate; add operator.

/hr$70

$90

$100
Tandem Gravel Truck (with driver)

Operated rate - driver included.

/hr$140

$165

$185
Telehandler - 10k Class

Bare rate; add operator.

/hr$95

$115

$135
Tractor & End Dump (with driver)

Operated rate - driver included.

/hr$170

$200

$225
Tractor & Lowboy (with driver)

Operated rate - driver included. Equipment moves.

/hr$200

$230

$270
Trencher - Ride-on

Bare rate; add operator.

/hr$110

$125

$155
Water Truck (with driver)

Operated rate - driver included.

/hr$125

$155

$180
Wheel Loader - 3-4 yd Class

Bare rate; add operator.

/hr$160

$185

$210

Alaska rates FAQ

What are construction charge-out rates in Alaska?

Alaska charge-out rates in this index are fully loaded T&M ranges for labor and equipment, in USD, as of 2026-08. They are not wages. Alaska charge-out rates carry camp, barge, and short-season premiums that a Lower 48 sheet will miss. North Slope and remote civil are not Anchorage commercial. These USD T&M ranges are a floor; add mobilization and isolation before you bill.

Are Alaska rates wages or billable T&M?

Billable T&M. Low, median, and high already include a public view of burden, overhead, and margin. They are not take-home pay and they are not a quote.

Can I put these Alaska numbers on an invoice?

No. This is a public benchmark. SubTrack rate sheets lock your crew numbers to the project so every LEM bills the rate the client signed.

Is this index union or open shop for Alaska?

It is a blended public range, not a union package and not a PLA. Confirm against the agreement on the job, then store that number on the project rate sheet.

Rate sheets

The index is a benchmark. Rate sheets are how you bill.

Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.

One template, every job

Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.

OT and markup apply themselves

Standby, overtime, and markup rules ride with the sheet. The field does not retype them.

The client sees what they signed

Line items match the agreed rates. Fewer disputes, faster approvals.

Project rate sheet

Labor · assigned to the job

PositionReg. rateOT rate
Foreman$72/hr$108/hr
Operator$68/hr$102/hr
Laborer$35/hr$52.50/hr