Alaska · USD
Alaska motor grader rates
Also called 140 grader, 14 grader, blade. Rates by SubTrack.
Alaska charge-out rates carry camp, barge, and short-season premiums that a Lower 48 sheet will miss. North Slope and remote civil are not Anchorage commercial. These USD T&M ranges are a floor; add mobilization and isolation before you bill. Motor grader charge-out in this book is 140/14 class, typically bare hourly. Fine grade, road maintenance, and pad shaping use this line. Fuel and the operator are usually extra. In Alaska, a motor grader typically bills $215 /hr (range $185 to $240, as of 2026-08). For a check against nearby markets, Washington sits at $185 /hr, and Northern Canada (YT/NT/NU) sits at $210 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.
Prices in USD. Fully loaded T&M charge-out, not wages.
Alaska motor grader
| Class | Unit | Low | Median | High |
|---|---|---|---|---|
Motor Grader - 140/14 Class Bare rate; add operator. | /hr | $185 | $215 | $240 |
Nearby motor grader rates
Alaska motor grader FAQ
What is the motor grader rate in Alaska?
Alaska motor grader charge-out is about $215 /hr (low $185, high $240, as of 2026-08). Also searched as 140 grader, 14 grader, blade. This is a fully loaded T&M range, not a wage.
Is this a rental or a T&M charge-out in Alaska?
A T&M charge-out. Fuel, attachments, and mobilization are often extra. AK, Anchorage, Fairbanks, and the Slope jobs still need the number that is on your sheet, not only this median.
Can I put this Alaska motor grader number on an invoice?
No. This is a public benchmark. SubTrack rate sheets lock your motor grader class and premiums to the LEM so the field bills what the client signed.
How does Alaska compare nearby?
Washington median $185 /hr. Northern Canada (YT/NT/NU) median $210 /hr
The index is a benchmark. Rate sheets are how you bill.
Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.
One template, every job
Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.
OT and markup apply themselves
Standby, overtime, and markup rules ride with the sheet. The field does not retype them.
The client sees what they signed
Line items match the agreed rates. Fewer disputes, faster approvals.
Project rate sheet
Labor · assigned to the job
| Position | Reg. rate | OT rate |
|---|---|---|
| Foreman | $72/hr | $108/hr |
| Operator | $68/hr | $102/hr |
| Laborer | $35/hr | $52.50/hr |