Arizona · USD
Arizona heavy equipment operator rates
Also called HEO, operator, equipment operator. Rates by SubTrack.
Arizona charge-out rates cover Phoenix civil, solar, and desert earthworks. Heat and night shifts change production more than the published hourly. Figures are USD fully loaded T&M ranges, not Davis-Bacon wages. Heavy equipment operator charge-out is the labor line that rides with the iron. It is not the machine rate. OT and shift premiums belong on the rate sheet, not in a public median. In Arizona, a heavy equipment operator typically bills $90 /hr (range $75 to $100, as of 2026-08). For a check against nearby markets, Nevada sits at $90 /hr, and New Mexico sits at $80 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.
Prices in USD. Fully loaded T&M charge-out, not wages.
Arizona heavy equipment operator
| Trade | Unit | Low | Median | High |
|---|---|---|---|---|
Heavy Equipment Operator Operator billed separately from bare equipment rate. | /hr | $75 | $90 | $100 |
Nearby heavy equipment operator rates
Arizona heavy equipment operator FAQ
What is the heavy equipment operator rate in Arizona?
Arizona heavy equipment operator charge-out is about $90 /hr (low $75, high $100, as of 2026-08). Also searched as HEO, operator, equipment operator. This is a fully loaded T&M range, not a wage.
Is this a rental or a T&M charge-out in Arizona?
A T&M charge-out. Fuel, attachments, and mobilization are often extra. AZ, Phoenix and Tucson jobs still need the number that is on your sheet, not only this median.
Can I put this Arizona heavy equipment operator number on an invoice?
No. This is a public benchmark. SubTrack rate sheets lock your heavy equipment operator class and premiums to the LEM so the field bills what the client signed.
How does Arizona compare nearby?
Nevada median $90 /hr. New Mexico median $80 /hr
The index is a benchmark. Rate sheets are how you bill.
Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.
One template, every job
Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.
OT and markup apply themselves
Standby, overtime, and markup rules ride with the sheet. The field does not retype them.
The client sees what they signed
Line items match the agreed rates. Fewer disputes, faster approvals.
Project rate sheet
Labor · assigned to the job
| Position | Reg. rate | OT rate |
|---|---|---|
| Foreman | $72/hr | $108/hr |
| Operator | $68/hr | $102/hr |
| Laborer | $35/hr | $52.50/hr |