Arizona · USD
Arizona general laborer rates
Also called laborer, construction laborer, labourer. Rates by SubTrack.
Arizona charge-out rates cover Phoenix civil, solar, and desert earthworks. Heat and night shifts change production more than the published hourly. Figures are USD fully loaded T&M ranges, not Davis-Bacon wages. General laborer charge-out is the most-used T&M labor line on civil tickets. It is not a pipelayer or a skilled laborer. OT rules belong on your sheet so the field does not invent them. In Arizona, a general laborer typically bills $60 /hr (range $50 to $65, as of 2026-08). For a check against nearby markets, Nevada sits at $60 /hr, and New Mexico sits at $55 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.
Prices in USD. Fully loaded T&M charge-out, not wages.
Arizona general laborer
| Trade | Unit | Low | Median | High |
|---|---|---|---|---|
General Laborer Site labor, flagging, general cleanup and support work. | /hr | $50 | $60 | $65 |
Nearby general laborer rates
Arizona general laborer FAQ
What is the general laborer rate in Arizona?
Arizona general laborer charge-out is about $60 /hr (low $50, high $65, as of 2026-08). Also searched as laborer, construction laborer, labourer. This is a fully loaded T&M range, not a wage.
Is this a rental or a T&M charge-out in Arizona?
A T&M charge-out. Fuel, attachments, and mobilization are often extra. AZ, Phoenix and Tucson jobs still need the number that is on your sheet, not only this median.
Can I put this Arizona general laborer number on an invoice?
No. This is a public benchmark. SubTrack rate sheets lock your general laborer class and premiums to the LEM so the field bills what the client signed.
How does Arizona compare nearby?
Nevada median $60 /hr. New Mexico median $55 /hr
The index is a benchmark. Rate sheets are how you bill.
Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.
One template, every job
Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.
OT and markup apply themselves
Standby, overtime, and markup rules ride with the sheet. The field does not retype them.
The client sees what they signed
Line items match the agreed rates. Fewer disputes, faster approvals.
Project rate sheet
Labor · assigned to the job
| Position | Reg. rate | OT rate |
|---|---|---|
| Foreman | $72/hr | $108/hr |
| Operator | $68/hr | $102/hr |
| Laborer | $35/hr | $52.50/hr |