Your privacy choices

We use necessary storage for site preferences. Analytics and advertising tools stay off until you allow them.

Georgia · USD

Georgia dozer rates

Also called bulldozer, D6, D8. Rates by SubTrack.

Georgia charge-out rates track Atlanta utilities, highway, and Savannah industrial work. The Southeast book is tighter than California and cheaper than New York. These USD ranges are fully loaded T&M, not wages. Dozer charge-out in this book is D6 class and D8 class, typically bare hourly with fuel extra. Spreading, stripping, and pad work use the D6. Rock and long pushes move to the D8. These are T&M equipment rates, not ownership cost. In Georgia, a dozer typically bills $170 /hr (range $145 to $190, as of 2026-08). For a check against nearby markets, Florida sits at $170 /hr, and Alabama sits at $160 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.

Prices in USD. Fully loaded T&M charge-out, not wages.

Georgia dozer

ClassUnitLowMedianHigh

Dozer - D6 Class

Bare rate; add operator.

/hr$145

$170

$190

Dozer - D8 Class

Bare rate; add operator.

/hr$200

$230

$260

Georgia dozer FAQ

What is the dozer rate in Georgia?

Georgia dozer charge-out is about $170 /hr (low $145, high $190, as of 2026-08). Also searched as bulldozer, D6, D8. This is a fully loaded T&M range, not a wage.

Is this a rental or a T&M charge-out in Georgia?

A T&M charge-out. Fuel, attachments, and mobilization are often extra. GA, Atlanta and Savannah jobs still need the number that is on your sheet, not only this median.

Can I put this Georgia dozer number on an invoice?

No. This is a public benchmark. SubTrack rate sheets lock your dozer class and premiums to the LEM so the field bills what the client signed.

How does Georgia compare nearby?

Florida median $170 /hr. Alabama median $160 /hr

Rate sheets

The index is a benchmark. Rate sheets are how you bill.

Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.

One template, every job

Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.

OT and markup apply themselves

Standby, overtime, and markup rules ride with the sheet. The field does not retype them.

The client sees what they signed

Line items match the agreed rates. Fewer disputes, faster approvals.

Project rate sheet

Labor · assigned to the job

PositionReg. rateOT rate
Foreman$72/hr$108/hr
Operator$68/hr$102/hr
Laborer$35/hr$52.50/hr