Your privacy choices

We use necessary storage for site preferences. Analytics and advertising tools stay off until you allow them.

Georgia · USD

Georgia working foreman rates

Also called foreman, working foreman, lead hand. Rates by SubTrack.

Georgia charge-out rates track Atlanta utilities, highway, and Savannah industrial work. The Southeast book is tighter than California and cheaper than New York. These USD ranges are fully loaded T&M, not wages. Working foreman charge-out is the lead-hand T&M line, not a salaried superintendent. Many sheets bill the foreman at a premium over the trade. Lock that premium on the project rate sheet. In Georgia, a working foreman typically bills $90 /hr (range $80 to $105, as of 2026-08). For a check against nearby markets, Florida sits at $95 /hr, and Alabama sits at $85 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.

Prices in USD. Fully loaded T&M charge-out, not wages.

Georgia working foreman

TradeUnitLowMedianHigh

Working Foreman

Trade foreman, typically working with tools.

/hr$80

$90

$105

Georgia working foreman FAQ

What is the working foreman rate in Georgia?

Georgia working foreman charge-out is about $90 /hr (low $80, high $105, as of 2026-08). Also searched as foreman, working foreman, lead hand. This is a fully loaded T&M range, not a wage.

Is this a rental or a T&M charge-out in Georgia?

A T&M charge-out. Fuel, attachments, and mobilization are often extra. GA, Atlanta and Savannah jobs still need the number that is on your sheet, not only this median.

Can I put this Georgia working foreman number on an invoice?

No. This is a public benchmark. SubTrack rate sheets lock your working foreman class and premiums to the LEM so the field bills what the client signed.

How does Georgia compare nearby?

Florida median $95 /hr. Alabama median $85 /hr

Rate sheets

The index is a benchmark. Rate sheets are how you bill.

Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.

One template, every job

Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.

OT and markup apply themselves

Standby, overtime, and markup rules ride with the sheet. The field does not retype them.

The client sees what they signed

Line items match the agreed rates. Fewer disputes, faster approvals.

Project rate sheet

Labor · assigned to the job

PositionReg. rateOT rate
Foreman$72/hr$108/hr
Operator$68/hr$102/hr
Laborer$35/hr$52.50/hr