Your privacy choices

We use necessary storage for site preferences. Analytics and advertising tools stay off until you allow them.

Ohio · USD

Ohio hydrovac rates

Also called hydro vac, vac truck, daylighting truck. Rates by SubTrack.

Ohio rates cover Midwest civil, auto, and chemical plant work. The book sits between the Southeast and the Northeast. These USD charge-out ranges are public T&M benchmarks, not take-home pay. Hydrovac charge-out is a two-person crew and the truck, billed by the hour. Daylighting, potholing, and winter thaw work all use this line. 2026 standard combo-truck quotes sit roughly $275–$400/hr in the US; this book is a blended T&M range, not an emergency call-out. Disposal and water are often extra. In Ohio, a hydrovac typically bills $330 /hr (range $285 to $370, as of 2026-08). For a check against nearby markets, Pennsylvania sits at $340 /hr, and Indiana sits at $315 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.

Prices in USD. Fully loaded T&M charge-out, not wages.

Ohio hydrovac

ClassUnitLowMedianHigh

Hydrovac Truck (2-person crew)

Operated rate - includes crew.

/hr$285

$330

$370

Ohio hydrovac FAQ

What is the hydrovac rate in Ohio?

Ohio hydrovac charge-out is about $330 /hr (low $285, high $370, as of 2026-08). Also searched as hydro vac, vac truck, daylighting truck. This is a fully loaded T&M range, not a wage.

Is this a rental or a T&M charge-out in Ohio?

A T&M charge-out. Fuel, attachments, and mobilization are often extra. OH, Columbus, Cleveland, and Cincinnati jobs still need the number that is on your sheet, not only this median.

Can I put this Ohio hydrovac number on an invoice?

No. This is a public benchmark. SubTrack rate sheets lock your hydrovac class and premiums to the LEM so the field bills what the client signed.

How does Ohio compare nearby?

Pennsylvania median $340 /hr. Indiana median $315 /hr

Rate sheets

The index is a benchmark. Rate sheets are how you bill.

Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.

One template, every job

Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.

OT and markup apply themselves

Standby, overtime, and markup rules ride with the sheet. The field does not retype them.

The client sees what they signed

Line items match the agreed rates. Fewer disputes, faster approvals.

Project rate sheet

Labor · assigned to the job

PositionReg. rateOT rate
Foreman$72/hr$108/hr
Operator$68/hr$102/hr
Laborer$35/hr$52.50/hr