Your privacy choices

We use necessary storage for site preferences. Analytics and advertising tools stay off until you allow them.

Oklahoma · USD

Oklahoma welder rates

Also called B-pressure welder, welder with rig, combo welder. Rates by SubTrack.

Oklahoma charge-out rates follow OKC civil, Tulsa industrial, and mid-continent energy. Pipe and hydrovac track Texas more than a Southeast dirt number. These USD figures are fully loaded T&M ranges. Welder charge-out here is B-pressure and welder-with-rig. The rig truck is a different line from the ticket. These are fully loaded T&M hours, not a shop wage. In Oklahoma, a welder typically bills $115 /hr (range $100 to $130, as of 2026-08). For a check against nearby markets, Texas sits at $115 /hr, and Kansas sits at $100 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.

Prices in USD. Fully loaded T&M charge-out, not wages.

Oklahoma welder

TradeUnitLowMedianHigh

Welder (B-Pressure)

Pressure welding; rate typically excludes rig.

/hr$100

$115

$130

Welder with Rig Truck

B-pressure welder including welding rig truck.

/hr$130

$145

$165

Oklahoma welder FAQ

What is the welder rate in Oklahoma?

Oklahoma welder charge-out is about $115 /hr (low $100, high $130, as of 2026-08). Also searched as B-pressure welder, welder with rig, combo welder. This is a fully loaded T&M range, not a wage.

Is this a rental or a T&M charge-out in Oklahoma?

A T&M charge-out. Fuel, attachments, and mobilization are often extra. OK, Oklahoma City and Tulsa jobs still need the number that is on your sheet, not only this median.

Can I put this Oklahoma welder number on an invoice?

No. This is a public benchmark. SubTrack rate sheets lock your welder class and premiums to the LEM so the field bills what the client signed.

How does Oklahoma compare nearby?

Texas median $115 /hr. Kansas median $100 /hr

Rate sheets

The index is a benchmark. Rate sheets are how you bill.

Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.

One template, every job

Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.

OT and markup apply themselves

Standby, overtime, and markup rules ride with the sheet. The field does not retype them.

The client sees what they signed

Line items match the agreed rates. Fewer disputes, faster approvals.

Project rate sheet

Labor · assigned to the job

PositionReg. rateOT rate
Foreman$72/hr$108/hr
Operator$68/hr$102/hr
Laborer$35/hr$52.50/hr