Nevada · USD
Nevada general laborer rates
Also called laborer, construction laborer, labourer. Rates by SubTrack.
Nevada charge-out rates cover Las Vegas civil, data-center, and Reno industrial work. Desert haul and night pours move equipment more than a laborer line. These USD ranges are fully loaded T&M benchmarks. General laborer charge-out is the most-used T&M labor line on civil tickets. It is not a pipelayer or a skilled laborer. OT rules belong on your sheet so the field does not invent them. In Nevada, a general laborer typically bills $60 /hr (range $50 to $70, as of 2026-08). For a check against nearby markets, Arizona sits at $60 /hr, and Utah sits at $60 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.
Prices in USD. Fully loaded T&M charge-out, not wages.
Nevada general laborer
| Trade | Unit | Low | Median | High |
|---|---|---|---|---|
General Laborer Site labor, flagging, general cleanup and support work. | /hr | $50 | $60 | $70 |
Nearby general laborer rates
Nevada general laborer FAQ
What is the general laborer rate in Nevada?
Nevada general laborer charge-out is about $60 /hr (low $50, high $70, as of 2026-08). Also searched as laborer, construction laborer, labourer. This is a fully loaded T&M range, not a wage.
Is this a rental or a T&M charge-out in Nevada?
A T&M charge-out. Fuel, attachments, and mobilization are often extra. NV, Las Vegas and Reno jobs still need the number that is on your sheet, not only this median.
Can I put this Nevada general laborer number on an invoice?
No. This is a public benchmark. SubTrack rate sheets lock your general laborer class and premiums to the LEM so the field bills what the client signed.
How does Nevada compare nearby?
Arizona median $60 /hr. Utah median $60 /hr
The index is a benchmark. Rate sheets are how you bill.
Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.
One template, every job
Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.
OT and markup apply themselves
Standby, overtime, and markup rules ride with the sheet. The field does not retype them.
The client sees what they signed
Line items match the agreed rates. Fewer disputes, faster approvals.
Project rate sheet
Labor · assigned to the job
| Position | Reg. rate | OT rate |
|---|---|---|
| Foreman | $72/hr | $108/hr |
| Operator | $68/hr | $102/hr |
| Laborer | $35/hr | $52.50/hr |