Nevada · USD
Nevada working foreman rates
Also called foreman, working foreman, lead hand. Rates by SubTrack.
Nevada charge-out rates cover Las Vegas civil, data-center, and Reno industrial work. Desert haul and night pours move equipment more than a laborer line. These USD ranges are fully loaded T&M benchmarks. Working foreman charge-out is the lead-hand T&M line, not a salaried superintendent. Many sheets bill the foreman at a premium over the trade. Lock that premium on the project rate sheet. In Nevada, a working foreman typically bills $110 /hr (range $95 to $120, as of 2026-08). For a check against nearby markets, Arizona sits at $100 /hr, and Utah sits at $100 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.
Prices in USD. Fully loaded T&M charge-out, not wages.
Nevada working foreman
| Trade | Unit | Low | Median | High |
|---|---|---|---|---|
Working Foreman Trade foreman, typically working with tools. | /hr | $95 | $110 | $120 |
Nearby working foreman rates
Nevada working foreman FAQ
What is the working foreman rate in Nevada?
Nevada working foreman charge-out is about $110 /hr (low $95, high $120, as of 2026-08). Also searched as foreman, working foreman, lead hand. This is a fully loaded T&M range, not a wage.
Is this a rental or a T&M charge-out in Nevada?
A T&M charge-out. Fuel, attachments, and mobilization are often extra. NV, Las Vegas and Reno jobs still need the number that is on your sheet, not only this median.
Can I put this Nevada working foreman number on an invoice?
No. This is a public benchmark. SubTrack rate sheets lock your working foreman class and premiums to the LEM so the field bills what the client signed.
How does Nevada compare nearby?
Arizona median $100 /hr. Utah median $100 /hr
The index is a benchmark. Rate sheets are how you bill.
Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.
One template, every job
Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.
OT and markup apply themselves
Standby, overtime, and markup rules ride with the sheet. The field does not retype them.
The client sees what they signed
Line items match the agreed rates. Fewer disputes, faster approvals.
Project rate sheet
Labor · assigned to the job
| Position | Reg. rate | OT rate |
|---|---|---|
| Foreman | $72/hr | $108/hr |
| Operator | $68/hr | $102/hr |
| Laborer | $35/hr | $52.50/hr |