Nevada · USD
Nevada hydrovac rates
Also called hydro vac, vac truck, daylighting truck. Rates by SubTrack.
Nevada charge-out rates cover Las Vegas civil, data-center, and Reno industrial work. Desert haul and night pours move equipment more than a laborer line. These USD ranges are fully loaded T&M benchmarks. Hydrovac charge-out is a two-person crew and the truck, billed by the hour. Daylighting, potholing, and winter thaw work all use this line. 2026 standard combo-truck quotes sit roughly $275–$400/hr in the US; this book is a blended T&M range, not an emergency call-out. Disposal and water are often extra. In Nevada, a hydrovac typically bills $340 /hr (range $295 to $380, as of 2026-08). For a check against nearby markets, Arizona sits at $325 /hr, and Utah sits at $330 /hr. These are public benchmarks. Your billable number lives on a SubTrack rate sheet.
Prices in USD. Fully loaded T&M charge-out, not wages.
Nevada hydrovac
| Class | Unit | Low | Median | High |
|---|---|---|---|---|
Hydrovac Truck (2-person crew) Operated rate - includes crew. | /hr | $295 | $340 | $380 |
Nearby hydrovac rates
Nevada hydrovac FAQ
What is the hydrovac rate in Nevada?
Nevada hydrovac charge-out is about $340 /hr (low $295, high $380, as of 2026-08). Also searched as hydro vac, vac truck, daylighting truck. This is a fully loaded T&M range, not a wage.
Is this a rental or a T&M charge-out in Nevada?
A T&M charge-out. Fuel, attachments, and mobilization are often extra. NV, Las Vegas and Reno jobs still need the number that is on your sheet, not only this median.
Can I put this Nevada hydrovac number on an invoice?
No. This is a public benchmark. SubTrack rate sheets lock your hydrovac class and premiums to the LEM so the field bills what the client signed.
How does Nevada compare nearby?
Arizona median $325 /hr. Utah median $330 /hr
The index is a benchmark. Rate sheets are how you bill.
Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.
One template, every job
Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.
OT and markup apply themselves
Standby, overtime, and markup rules ride with the sheet. The field does not retype them.
The client sees what they signed
Line items match the agreed rates. Fewer disputes, faster approvals.
Project rate sheet
Labor · assigned to the job
| Position | Reg. rate | OT rate |
|---|---|---|
| Foreman | $72/hr | $108/hr |
| Operator | $68/hr | $102/hr |
| Laborer | $35/hr | $52.50/hr |