Massachusetts charge-out rates

Also called MA, Boston and Worcester. Rates by SubTrack.

Massachusetts charge-out rates follow Boston civil, utilities, and Worcester industrial. Union density and urban access push labor above the national median. These USD figures are public T&M ranges, not a PLA.

Prices in USD. Fully loaded T&M charge-out, not wages.

Massachusetts labor

TradeUnitLowMedianHigh
Boilermaker

Pressure vessel and boiler work.

/hr$115

$130

$150
Carpenter (Journeyman)

Formwork, framing, finishing.

/hr$90

$100

$115
Concrete Finisher

Placing and finishing structural and flatwork concrete.

/hr$90

$100

$115
Crane Operator (Journeyman)

Mobile and tower crane operation.

/hr$115

$130

$150
Electrician (Journeyman)

Industrial and commercial electrical installation.

/hr$105

$125

$140
General Laborer

Site labor, flagging, general cleanup and support work.

/hr$65

$75

$90
Heavy Equipment Operator

Operator billed separately from bare equipment rate.

/hr$95

$115

$125
HVAC / Refrigeration Mechanic

HVAC installation and service.

/hr$105

$125

$140
Instrumentation Technician

Instrumentation and controls, industrial plants.

/hr$120

$140

$150
Insulator (Mechanical)

Mechanical insulation, industrial settings.

/hr$95

$115

$125
Ironworker

Structural steel erection, rebar placing.

/hr$100

$115

$130
Millwright

Mechanical equipment installation and alignment.

/hr$115

$125

$145
Painter / Coatings (Industrial)

Industrial coatings and blasting.

/hr$90

$100

$120
Pipefitter / Steamfitter

Process and utility piping, industrial settings.

/hr$115

$125

$145
Plumber (Journeyman)

Commercial and industrial plumbing.

/hr$100

$115

$130
Project Manager

Typically billed on T&M for owner-directed extras.

/hr$145

$165

$190
Safety Officer (NCSO/CHST)

Dedicated site safety supervision.

/hr$95

$115

$125
Scaffolder

Scaffold erection and dismantle.

/hr$90

$100

$120
Skilled Laborer / Pipelayer

Grade checking, pipe laying, trench work.

/hr$75

$90

$95
Superintendent

Site supervision above foreman level.

/hr$140

$155

$175
Survey Crew (2-person, equipped)

Two-person survey crew including instruments.

/hr$165

$190

$220
Truck Driver (Class 1 / CDL-A)

Driver billed separately from bare truck rate.

/hr$75

$90

$100
Welder (B-Pressure)

Pressure welding; rate typically excludes rig.

/hr$125

$145

$165
Welder with Rig Truck

B-pressure welder including welding rig truck.

/hr$165

$190

$215
Working Foreman

Trade foreman, typically working with tools.

/hr$115

$125

$145

Massachusetts equipment

EquipmentUnitLowMedianHigh
Air Compressor - 185 CFM

Daily bare rental, fuel extra.

/day$95

$125

$145
Articulated Rock Truck - 40 Ton

Bare rate; add operator.

/hr$170

$195

$225
Backhoe - Loader/Backhoe

Bare rate; add operator.

/hr$90

$105

$125
Boom Lift - 60 ft

Bare rate.

/hr$75

$90

$105
Dozer - D6 Class

Bare rate; add operator.

/hr$170

$195

$225
Dozer - D8 Class

Bare rate; add operator.

/hr$235

$270

$305
Excavator - 20 Ton Class (e.g. 320/200)

Bare rate; add operator. Tracked hydraulic excavator.

/hr$155

$180

$210
Excavator - 30 Ton Class (e.g. 330/300)

Bare rate; add operator.

/hr$195

$225

$255
Excavator - 45 Ton Class

Bare rate; add operator. Mass excavation class.

/hr$245

$290

$330
Generator - 100 kW

Daily bare rental, fuel extra.

/day$240

$290

$345
Hydrovac Truck (2-person crew)

Operated rate - includes crew.

/hr$325

$370

$415
Light Tower

Daily bare rental, fuel extra.

/day$120

$150

$185
Mini Excavator - 3-5 Ton

Bare rate; add operator.

/hr$75

$90

$105
Mobile Crane - 100 Ton (operated)

Operated and maintained rate.

/hr$330

$380

$435
Mobile Crane - 60 Ton (operated)

Operated and maintained rate.

/hr$255

$290

$335
Motor Grader - 140/14 Class

Bare rate; add operator.

/hr$165

$190

$215
Motor Scraper - 621/623 Class

Bare rate; add operator.

/hr$230

$265

$300
Packer - Padfoot/Smooth 84"

Bare rate; add operator.

/hr$110

$135

$150
Picker / Boom Truck - 45 Ton (operated)

Operated rate.

/hr$215

$245

$285
Scissor Lift - 26 ft

Daily bare rental.

/day$185

$225

$265
Site Office Trailer

Daily rate, delivery extra.

/day$45

$60

$80
Skid Steer

Bare rate; add operator.

/hr$60

$80

$90
Tandem Gravel Truck (with driver)

Operated rate - driver included.

/hr$125

$145

$165
Telehandler - 10k Class

Bare rate; add operator.

/hr$85

$100

$120
Tractor & End Dump (with driver)

Operated rate - driver included.

/hr$150

$175

$195
Tractor & Lowboy (with driver)

Operated rate - driver included. Equipment moves.

/hr$175

$200

$235
Trencher - Ride-on

Bare rate; add operator.

/hr$95

$110

$135
Water Truck (with driver)

Operated rate - driver included.

/hr$110

$135

$155
Wheel Loader - 3-4 yd Class

Bare rate; add operator.

/hr$140

$165

$185

Massachusetts rates FAQ

What are construction charge-out rates in Massachusetts?

Massachusetts charge-out rates in this index are fully loaded T&M ranges for labor and equipment, in USD, as of 2026-08. They are not wages. Massachusetts charge-out rates follow Boston civil, utilities, and Worcester industrial. Union density and urban access push labor above the national median. These USD figures are public T&M ranges, not a PLA.

Are Massachusetts rates wages or billable T&M?

Billable T&M. Low, median, and high already include a public view of burden, overhead, and margin. They are not take-home pay and they are not a quote.

Can I put these Massachusetts numbers on an invoice?

No. This is a public benchmark. SubTrack rate sheets lock your crew numbers to the project so every LEM bills the rate the client signed.

Is this index union or open shop for Massachusetts?

It is a blended public range, not a union package and not a PLA. Confirm against the agreement on the job, then store that number on the project rate sheet.

Rate sheets

The index is a benchmark. Rate sheets are how you bill.

Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.

One template, every job

Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.

OT and markup apply themselves

Standby, overtime, and markup rules ride with the sheet. The field does not retype them.

The client sees what they signed

Line items match the agreed rates. Fewer disputes, faster approvals.

Project rate sheet

Labor · assigned to the job

PositionReg. rateOT rate
Foreman$72/hr$108/hr
Operator$68/hr$102/hr
Laborer$35/hr$52.50/hr