Maryland labor

TradeUnitLowMedianHigh
Boilermaker

Pressure vessel and boiler work.

/hr$105

$120

$140
Carpenter (Journeyman)

Formwork, framing, finishing.

/hr$80

$95

$105
Concrete Finisher

Placing and finishing structural and flatwork concrete.

/hr$80

$95

$105
Crane Operator (Journeyman)

Mobile and tower crane operation.

/hr$105

$120

$140
Electrician (Journeyman)

Industrial and commercial electrical installation.

/hr$100

$115

$130
General Laborer

Site labor, flagging, general cleanup and support work.

/hr$60

$70

$80
Heavy Equipment Operator

Operator billed separately from bare equipment rate.

/hr$85

$105

$115
HVAC / Refrigeration Mechanic

HVAC installation and service.

/hr$100

$115

$130
Instrumentation Technician

Instrumentation and controls, industrial plants.

/hr$110

$130

$140
Insulator (Mechanical)

Mechanical insulation, industrial settings.

/hr$85

$105

$115
Ironworker

Structural steel erection, rebar placing.

/hr$95

$105

$120
Millwright

Mechanical equipment installation and alignment.

/hr$105

$115

$135
Painter / Coatings (Industrial)

Industrial coatings and blasting.

/hr$80

$95

$110
Pipefitter / Steamfitter

Process and utility piping, industrial settings.

/hr$105

$115

$135
Plumber (Journeyman)

Commercial and industrial plumbing.

/hr$95

$105

$120
Project Manager

Typically billed on T&M for owner-directed extras.

/hr$135

$150

$175
Safety Officer (NCSO/CHST)

Dedicated site safety supervision.

/hr$85

$105

$115
Scaffolder

Scaffold erection and dismantle.

/hr$80

$95

$110
Skilled Laborer / Pipelayer

Grade checking, pipe laying, trench work.

/hr$70

$80

$85
Superintendent

Site supervision above foreman level.

/hr$130

$145

$165
Survey Crew (2-person, equipped)

Two-person survey crew including instruments.

/hr$150

$175

$205
Truck Driver (Class 1 / CDL-A)

Driver billed separately from bare truck rate.

/hr$70

$80

$95
Welder (B-Pressure)

Pressure welding; rate typically excludes rig.

/hr$115

$135

$150
Welder with Rig Truck

B-pressure welder including welding rig truck.

/hr$150

$175

$200
Working Foreman

Trade foreman, typically working with tools.

/hr$105

$115

$135

Maryland equipment

EquipmentUnitLowMedianHigh
Air Compressor - 185 CFM

Daily bare rental, fuel extra.

/day$90

$120

$140
Articulated Rock Truck - 40 Ton

Bare rate; add operator.

/hr$160

$190

$215
Backhoe - Loader/Backhoe

Bare rate; add operator.

/hr$85

$100

$120
Boom Lift - 60 ft

Bare rate.

/hr$70

$85

$100
Dozer - D6 Class

Bare rate; add operator.

/hr$160

$190

$215
Dozer - D8 Class

Bare rate; add operator.

/hr$225

$260

$290
Excavator - 20 Ton Class (e.g. 320/200)

Bare rate; add operator. Tracked hydraulic excavator.

/hr$150

$170

$200
Excavator - 30 Ton Class (e.g. 330/300)

Bare rate; add operator.

/hr$190

$215

$240
Excavator - 45 Ton Class

Bare rate; add operator. Mass excavation class.

/hr$235

$280

$320
Generator - 100 kW

Daily bare rental, fuel extra.

/day$230

$280

$330
Hydrovac Truck (2-person crew)

Operated rate - includes crew.

/hr$315

$355

$400
Light Tower

Daily bare rental, fuel extra.

/day$115

$145

$180
Mini Excavator - 3-5 Ton

Bare rate; add operator.

/hr$70

$85

$100
Mobile Crane - 100 Ton (operated)

Operated and maintained rate.

/hr$320

$365

$415
Mobile Crane - 60 Ton (operated)

Operated and maintained rate.

/hr$240

$280

$325
Motor Grader - 140/14 Class

Bare rate; add operator.

/hr$155

$185

$205
Motor Scraper - 621/623 Class

Bare rate; add operator.

/hr$220

$255

$285
Packer - Padfoot/Smooth 84"

Bare rate; add operator.

/hr$110

$130

$145
Picker / Boom Truck - 45 Ton (operated)

Operated rate.

/hr$205

$235

$275
Scissor Lift - 26 ft

Daily bare rental.

/day$180

$215

$255
Site Office Trailer

Daily rate, delivery extra.

/day$45

$60

$75
Skid Steer

Bare rate; add operator.

/hr$60

$75

$85
Tandem Gravel Truck (with driver)

Operated rate - driver included.

/hr$120

$140

$155
Telehandler - 10k Class

Bare rate; add operator.

/hr$80

$95

$115
Tractor & End Dump (with driver)

Operated rate - driver included.

/hr$145

$165

$190
Tractor & Lowboy (with driver)

Operated rate - driver included. Equipment moves.

/hr$165

$195

$225
Trencher - Ride-on

Bare rate; add operator.

/hr$90

$110

$130
Water Truck (with driver)

Operated rate - driver included.

/hr$110

$130

$150
Wheel Loader - 3-4 yd Class

Bare rate; add operator.

/hr$135

$155

$180

Maryland rates FAQ

What are construction charge-out rates in Maryland?

Maryland charge-out rates in this index are fully loaded T&M ranges for labor and equipment, in USD, as of 2026-08. They are not wages. Maryland rates span Baltimore port and industrial, plus DC-suburb civil and utilities. Prevailing wage on public work can sit above this blended book. These USD ranges are T&M charge-out benchmarks.

Are Maryland rates wages or billable T&M?

Billable T&M. Low, median, and high already include a public view of burden, overhead, and margin. They are not take-home pay and they are not a quote.

Can I put these Maryland numbers on an invoice?

No. This is a public benchmark. SubTrack rate sheets lock your crew numbers to the project so every LEM bills the rate the client signed.

Is this index union or open shop for Maryland?

It is a blended public range, not a union package and not a PLA. Confirm against the agreement on the job, then store that number on the project rate sheet.

Rate sheets

The index is a benchmark. Rate sheets are how you bill.

Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.

One template, every job

Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.

OT and markup apply themselves

Standby, overtime, and markup rules ride with the sheet. The field does not retype them.

The client sees what they signed

Line items match the agreed rates. Fewer disputes, faster approvals.

Project rate sheet

Labor · assigned to the job

PositionReg. rateOT rate
Foreman$72/hr$108/hr
Operator$68/hr$102/hr
Laborer$35/hr$52.50/hr