New Hampshire charge-out rates

Also called NH, Manchester and the Seacoast. Rates by SubTrack.

New Hampshire rates follow Manchester civil, Seacoast work, and Boston-overflow trades. A smaller market still prices closer to Massachusetts than to the Southeast. These USD figures are T&M charge-out ranges.

Prices in USD. Fully loaded T&M charge-out, not wages.

New Hampshire labor

TradeUnitLowMedianHigh
Boilermaker

Pressure vessel and boiler work.

/hr$100

$115

$130
Carpenter (Journeyman)

Formwork, framing, finishing.

/hr$75

$90

$100
Concrete Finisher

Placing and finishing structural and flatwork concrete.

/hr$75

$90

$100
Crane Operator (Journeyman)

Mobile and tower crane operation.

/hr$100

$115

$130
Electrician (Journeyman)

Industrial and commercial electrical installation.

/hr$95

$110

$120
General Laborer

Site labor, flagging, general cleanup and support work.

/hr$55

$65

$75
Heavy Equipment Operator

Operator billed separately from bare equipment rate.

/hr$80

$100

$110
HVAC / Refrigeration Mechanic

HVAC installation and service.

/hr$95

$110

$120
Instrumentation Technician

Instrumentation and controls, industrial plants.

/hr$105

$120

$130
Insulator (Mechanical)

Mechanical insulation, industrial settings.

/hr$80

$100

$110
Ironworker

Structural steel erection, rebar placing.

/hr$90

$100

$115
Millwright

Mechanical equipment installation and alignment.

/hr$100

$110

$125
Painter / Coatings (Industrial)

Industrial coatings and blasting.

/hr$75

$90

$105
Pipefitter / Steamfitter

Process and utility piping, industrial settings.

/hr$100

$110

$125
Plumber (Journeyman)

Commercial and industrial plumbing.

/hr$90

$100

$115
Project Manager

Typically billed on T&M for owner-directed extras.

/hr$125

$140

$165
Safety Officer (NCSO/CHST)

Dedicated site safety supervision.

/hr$80

$100

$110
Scaffolder

Scaffold erection and dismantle.

/hr$75

$90

$105
Skilled Laborer / Pipelayer

Grade checking, pipe laying, trench work.

/hr$65

$75

$80
Superintendent

Site supervision above foreman level.

/hr$120

$135

$155
Survey Crew (2-person, equipped)

Two-person survey crew including instruments.

/hr$140

$165

$190
Truck Driver (Class 1 / CDL-A)

Driver billed separately from bare truck rate.

/hr$65

$75

$90
Welder (B-Pressure)

Pressure welding; rate typically excludes rig.

/hr$110

$125

$140
Welder with Rig Truck

B-pressure welder including welding rig truck.

/hr$140

$165

$185
Working Foreman

Trade foreman, typically working with tools.

/hr$100

$110

$125

New Hampshire equipment

EquipmentUnitLowMedianHigh
Air Compressor - 185 CFM

Daily bare rental, fuel extra.

/day$90

$115

$135
Articulated Rock Truck - 40 Ton

Bare rate; add operator.

/hr$155

$185

$210
Backhoe - Loader/Backhoe

Bare rate; add operator.

/hr$85

$100

$115
Boom Lift - 60 ft

Bare rate.

/hr$70

$85

$100
Dozer - D6 Class

Bare rate; add operator.

/hr$155

$185

$210
Dozer - D8 Class

Bare rate; add operator.

/hr$220

$250

$280
Excavator - 20 Ton Class (e.g. 320/200)

Bare rate; add operator. Tracked hydraulic excavator.

/hr$145

$165

$195
Excavator - 30 Ton Class (e.g. 330/300)

Bare rate; add operator.

/hr$185

$210

$235
Excavator - 45 Ton Class

Bare rate; add operator. Mass excavation class.

/hr$230

$270

$310
Generator - 100 kW

Daily bare rental, fuel extra.

/day$225

$270

$320
Hydrovac Truck (2-person crew)

Operated rate - includes crew.

/hr$305

$345

$385
Light Tower

Daily bare rental, fuel extra.

/day$110

$140

$175
Mini Excavator - 3-5 Ton

Bare rate; add operator.

/hr$70

$85

$100
Mobile Crane - 100 Ton (operated)

Operated and maintained rate.

/hr$310

$355

$405
Mobile Crane - 60 Ton (operated)

Operated and maintained rate.

/hr$235

$270

$315
Motor Grader - 140/14 Class

Bare rate; add operator.

/hr$150

$180

$200
Motor Scraper - 621/623 Class

Bare rate; add operator.

/hr$215

$245

$275
Packer - Padfoot/Smooth 84"

Bare rate; add operator.

/hr$105

$125

$140
Picker / Boom Truck - 45 Ton (operated)

Operated rate.

/hr$200

$230

$265
Scissor Lift - 26 ft

Daily bare rental.

/day$175

$210

$245
Site Office Trailer

Daily rate, delivery extra.

/day$40

$60

$75
Skid Steer

Bare rate; add operator.

/hr$60

$75

$85
Tandem Gravel Truck (with driver)

Operated rate - driver included.

/hr$115

$135

$150
Telehandler - 10k Class

Bare rate; add operator.

/hr$80

$95

$110
Tractor & End Dump (with driver)

Operated rate - driver included.

/hr$140

$160

$185
Tractor & Lowboy (with driver)

Operated rate - driver included. Equipment moves.

/hr$160

$190

$220
Trencher - Ride-on

Bare rate; add operator.

/hr$90

$105

$125
Water Truck (with driver)

Operated rate - driver included.

/hr$105

$125

$145
Wheel Loader - 3-4 yd Class

Bare rate; add operator.

/hr$130

$150

$175

New Hampshire rates FAQ

What are construction charge-out rates in New Hampshire?

New Hampshire charge-out rates in this index are fully loaded T&M ranges for labor and equipment, in USD, as of 2026-08. They are not wages. New Hampshire rates follow Manchester civil, Seacoast work, and Boston-overflow trades. A smaller market still prices closer to Massachusetts than to the Southeast. These USD figures are T&M charge-out ranges.

Are New Hampshire rates wages or billable T&M?

Billable T&M. Low, median, and high already include a public view of burden, overhead, and margin. They are not take-home pay and they are not a quote.

Can I put these New Hampshire numbers on an invoice?

No. This is a public benchmark. SubTrack rate sheets lock your crew numbers to the project so every LEM bills the rate the client signed.

Is this index union or open shop for New Hampshire?

It is a blended public range, not a union package and not a PLA. Confirm against the agreement on the job, then store that number on the project rate sheet.

Rate sheets

The index is a benchmark. Rate sheets are how you bill.

Rates shows public charge-out ranges. SubTrack rate sheets lock your crew numbers into a template the field actually bills from, on every LEM.

One template, every job

Labor, equipment, materials, and subs live in one sheet. Assign it to a project and tickets read the same numbers.

OT and markup apply themselves

Standby, overtime, and markup rules ride with the sheet. The field does not retype them.

The client sees what they signed

Line items match the agreed rates. Fewer disputes, faster approvals.

Project rate sheet

Labor · assigned to the job

PositionReg. rateOT rate
Foreman$72/hr$108/hr
Operator$68/hr$102/hr
Laborer$35/hr$52.50/hr