Free Charge-Out Index
Ratesby SubTrack
Public T&M reference ranges for labor and equipment. Labor rows are charge-out estimates. Equipment rows are bare, operated, or rental when the description says so. Browse a region and confirm the signed rate before you bill.
Ask, when available, answers from this local reference book for the region you pick. It does not search live supplier quotes. The tables stay on this page either way. See how the book is built for provenance. How the book is built.
Charge-out ranges, not wages. Confirm against your own burden and the job before you bill.
Country
Province
Search
Type
* Prices in CAD
| Item | Low | Central | High |
|---|---|---|---|
Pressure vessel and boiler work. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $100 CAD | $120 CAD | $135 CAD |
Formwork, framing, finishing. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $75 CAD | $90 CAD | $100 CAD |
Placing and finishing structural and flatwork concrete. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $75 CAD | $90 CAD | $100 CAD |
Mobile and tower crane operation. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $100 CAD | $120 CAD | $135 CAD |
Industrial and commercial electrical installation. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $95 CAD | $110 CAD | $125 CAD |
Site labor, flagging, general cleanup and support work. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $55 CAD | $65 CAD | $75 CAD |
Operator billed separately from bare equipment rate. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $85 CAD | $100 CAD | $110 CAD |
HVAC installation and service. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $95 CAD | $110 CAD | $125 CAD |
Instrumentation and controls, industrial plants. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $105 CAD | $120 CAD | $135 CAD |
Mechanical insulation, industrial settings. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $85 CAD | $100 CAD | $110 CAD |
Structural steel erection, rebar placing. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $90 CAD | $100 CAD | $115 CAD |
Mechanical equipment installation and alignment. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $100 CAD | $110 CAD | $125 CAD |
Painter / Coatings (Industrial) Industrial coatings and blasting. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $80 CAD | $90 CAD | $105 CAD |
Process and utility piping, industrial settings. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $100 CAD | $110 CAD | $125 CAD |
Commercial and industrial plumbing. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $90 CAD | $100 CAD | $115 CAD |
Typically billed on T&M for owner-directed extras. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $130 CAD | $150 CAD | $170 CAD |
Dedicated site safety supervision. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $85 CAD | $100 CAD | $110 CAD |
Scaffold erection and dismantle. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $80 CAD | $90 CAD | $105 CAD |
Grade checking, pipe laying, trench work. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $65 CAD | $75 CAD | $85 CAD |
Site supervision above foreman level. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $125 CAD | $140 CAD | $160 CAD |
Survey Crew (2-person, equipped) Two-person survey crew including instruments. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $145 CAD | $170 CAD | $195 CAD |
Truck Driver (Class 1 / CDL-A) Driver billed separately from bare truck rate. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $65 CAD | $75 CAD | $85 CAD |
Pressure welding; rate typically excludes rig. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $110 CAD | $130 CAD | $145 CAD |
B-pressure welder including welding rig truck. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $145 CAD | $170 CAD | $190 CAD |
Trade foreman, typically working with tools. Labor charge-out · CAD/hr · Reference estimate · effective 2026-08 | $100 CAD | $115 CAD | $130 CAD |
25 lines for New Brunswick
How to read this index
Rates is a public reference book, not a wage survey and not a measured market median. Labor rows are charge-out estimates. Equipment rows are bare, operated, or rental when the description says so. Canadian provinces are CAD. US states are USD. Some US states are modeled from the Texas baseline. Hydrovac rows include a modeled adjustment. See the methodology page for what remains unverified.
Limitations: figures are public ranges, not quotes. They are not wages, union packages, or Davis-Bacon determinations. Rows carry an as-of month. Confirm against the project rate sheet before you bill. Read the full methodology.
Your billable number lives on a SubTrack rate sheet, assigned to the project, so every daily ticket uses the same labor and equipment rates.
Rates by region
Rates by trade and iron
Rates FAQ
What are these construction charge-out rates?
Public T&M reference ranges for labor and equipment across Canada and the US. They are not wages and not a quote. Each row states whether the number is labor charge-out, bare equipment, operated equipment, or rental.
Can I put a median from this index on an invoice?
No. This is a public benchmark. In SubTrack, the rates you agreed with the client go on the project rate sheet and apply to each daily ticket.
Are the prices in CAD or USD?
Canadian regions are CAD. US states are USD. The as-of date is on each row. Confirm against the job before you bill.
Is this a union package or open shop?
A blended public range, not a union package and not a PLA. Store the number the job signed on a SubTrack rate sheet.
Use your agreed rates on every daily ticket.
These public ranges are a benchmark. SubTrack stores the rates you agreed with the client on a project rate sheet. Crews apply those rates to labor, equipment, materials, and subcontractors on the daily ticket. The same figures carry into reporting and the billing documents you send.